For multi-stop deliveries, the best gate is the one that gives access to the right load at the right stop. A large opening elsewhere on the trailer may add little value. Gate positions, fixed posts and the delivery sequence should therefore be reviewed on the same cargo plan.

A Three-Stop Planning Example
Consider an illustrative journey serving customers A, B and C. Mark their packages on a deck sketch in the planned delivery order. For each stop, show which side is accessible and which gate sections would need handling. If A’s packages cannot be reached without moving B’s goods, the layout needs review. This is a planning example, not a GENRON customer case or a prescribed load distribution for a particular vehicle.
Draw the Clear Openings Beside the Cargo Positions
Mark posts and the usable openings on the same sketch. A long visible fence section may still be divided by a fixed post. Compare package width and unloading-equipment access with the opening that the specified body actually provides. Include rear access if one receiving yard cannot accommodate side unloading. The drawing should identify removable components clearly instead of leaving the operator to infer them from a photograph.
Count the Handling Steps at Each Stop
A removable fence section needs handling space and a place to be stored during unloading. A hinged section needs movement clearance and its approved holding arrangement. Record which components have to be handled at each stop and whether the cover or upper supports add another step. A configuration that is convenient at the main depot may become cumbersome when the same operations are repeated at several smaller sites.
Review the Cargo That Remains on the Trailer
Partial unloading changes the remaining load. The transport operator’s plan needs to maintain appropriate support and restraint throughout the journey, with access to the designated securing points. Fence sections should not be assumed to restrain every type of cargo. Review the unloading sequence and the approved body arrangement together before finalising the gate layout.
Use This Stop-by-Stop Review
| At each delivery | Record on the cargo plan |
|---|---|
| Access side | Available side or rear access and unloading equipment. |
| Required opening | Gate sections, fixed posts and packaged cargo dimensions. |
| Section handling | Items to move, available space and storage arrangement. |
| Remaining load | Support, restraint and access to designated securing points. |
What the Final Gate Drawing Should Show
Gate divisions, fixed posts and approved removable pieces.
Usable openings beside each normal delivery load.
Lock, cover and support positions that affect access.
The cargo sequence and loading-site constraints used for the review.
A Gate Size Question
Are larger gates always better for several deliveries?
No. Position, fixed posts and handling steps can matter more than the visible section length. Review the actual delivery sequence.
Related Products and Reading
Review a multi-stop fence layout with GENRON. Attach a stop-by-stop cargo sketch and site access information so gate divisions can be discussed against the journey.